Ashdod Gateways – Section B

Ashdod Port Access Road Project

Ramet proudly leads the construction of a 1.5-kilometre access road serving the Ashdod Port area, integrating advanced engineering methods to meet demanding schedules and the highest quality standards.

The project scope includes:

Two beam bridges

One pedestrian bridge combining precast beams with a cast-in-place deck

Two bridges constructed using the incremental launching method

Road sections supported by terre armée retaining walls

All beams, including those for the incremental launch bridges, are cast on-site — ensuring maximum precision, strict quality control, and complete adaptation to the project’s specific requirements.
Bridge designs were prepared by Avidan Engineers, and N5 executed the post-tensioning works.

Status – In Execution

Location

TON–RAMET Group

TON–RAMET Group – Ton Earthworks Ltd and Ramet Ltd, is one of Israel’s leading construction and infrastructure. The Group specializes in infrastructure complex public works. Renowned for its efficiency, stability, safety, and consistent success, Ton-Ramet upholds the highest engineering and safety standards and holds the top classification licenses for all public and government infrastructure projects in Israel.